1 November 2023 Planning Committee – Additional Representations

 

 

Page

Site Address

Application No.

Comment

Item B:

 

p51

 

 

 

 

 

P54

 

 

 

 

 

 

 

 

 

 

 

 

 

P55

 

 

 

 

 

P60

 

 

 

 

 

 

 

 

P60

 

 

 

 

 

 

 

 

 

 

P65

 

 

 

 

 

 

 

 

 

 

 

 

 

P55

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

P80

 

 

 

 

Ovingdean Hall English Language School Greenways Brighton BN2 7BA

BH2023/00830

Update to S106 Heads of Terms:

Transport

-              A Travel Plan and an accompanying Monitoring fee of £8,404.80 £7,004

 

 

Updated wording of several conditions to clarify the timing of detailed submissions:

 

Condition 3:

The development hereby permitted shall not be commenced, other than demolition, until full details of existing and proposed ground levels (referenced as Above Ordnance Datum) within the site and on land and buildings adjoining the site by means of spot heights and cross-sections, proposed siting and finished floor levels of all buildings and structures, have been submitted to and approved by the Local Planning Authority.  The development shall then be implemented in accordance with the approved level details. 

Reason: As this matter is fundamental to the acceptable delivery of the permission to safeguard the amenities of nearby properties and to safeguard the character and appearance of the area, in addition to comply with Policies DM18 and DM20 of Brighton & Hove City Plan Part 2 and CP12 of the Brighton & Hove City Plan Part One.

 

Condition 10:

No development, other than demolition, shall take place until an Ecological Design, Management and Monitoring Strategy (EDMMS) for the provision of a minimum 10% biodiversity net gain within a 30-year period [etc.]

 

 

 

Condition 20:

No external community use of the relocated MUGA shall take place until a management plan for the MUGA has been submitted to and approved in writing by the Local Planning Authority. The Management Plan should set out how the MUGA will be made available for external use, how this would operate and how any impacts upon residents will be minimised.

Reason: To safeguard the amenities of the occupiers of adjoining properties and to comply with policy DM20 of the Brighton & Hove City Plan Part Two.

 

Condition 21:

No development of any boundary treatment to the west of the site onto Ovingdean Road shall take place until a sample panel of flintwork has been constructed on the site and approved in writing by the Local Planning Authority. The flintwork comprised within the development shall be carried out and completed to match the approved sample flint panel.

Reason:  To ensure a satisfactory appearance to the development and to comply with policies DM18, DM21 and DM26 of Brighton & Hove City Plan Part 2 and CP12 and CP15 of the Brighton & Hove City Plan Part One.

 

 

Consultee comment received from Sustainability Officer:

·         Overall, the energy proposals, set out in the Energy Statement Report, are acceptable, using air source heat pumps for heating and hot water along with good building fabric and a good amount of roof-mounted solar panels.

·         This reduces the carbon emissions by (as designed) 26.7% - a combined figure for the two buildings. Building 2 is significantly more energy efficient than Building 1. The carbon emissions reduction meets the requirements of City Plan Part 1 and Part 2.

·         Condition 18 appropriately requires a post-construction BREEAM certificate achieving an Excellent’ rating.

·         Condition 7 can be re-worded to require compliance with the submitted Energy Statement Report

 

 

Revision of condition 7 in response to comments from Sustainability Officer:

 

Condition 7:

7. Prior to the commencement of development an energy statement shall be

submitted for approval in writing setting out how the clubhouse will achieve

carbon emissions reduction in line with the requirement of the Future Buildings

Standards including building fabric details and heating/hot water solutions

together with thermal modelling to ensure risks of overheating are mitigated and

to ensure correct sizing of heating and ventilation systems.

Reason: In order to comply with Brighton and Hove City Plan Part 1 policy CP8

and Brighton and Hove Submission City Plan Part 2 policy DM44.

 

The development hereby permitted shall be carried out in accordance with the Energy Statement Report (ESR) received 17th March 2023. The measures identified within the ESR shall be retained and maintained thereafter.

Reason: In order to comply with policy CP8 of the Brighton and Hove City Plan Part One and policy DM44 of the Brighton and Hove City Plan Part Two.

 

 

Additional paragraph relating to the Community Infrastructure Levy (CIL):

 

COMMUNITY INFRASTRUCTURE LEVY

The proposal is not liable for CIL as the proposed boarding accommodation falls under a C2 use class. The only charge within the Brighton & Hove City Council CIL Charging Schedule for Class C2 use is for ‘C2 – Extra Care / Assisted Living’ which does not apply to this scheme.

 

Item C

 

 

 

 

 

 

P87

58-60 Beaconsfield Road BN1 4QJ

 

BH2023/01186

MP Representation

 

A copy of the representation from Caroline Lucas MP has been attached.

 

 

 

 

Condition 1

 

Condition 1 (plans condition) has been updated to include the Ecology report which was missing and ensure versions are correct:

 

Plan Type

Reference

Version

Date Received

Proposed Drawing

E104  

V3

6 October 2023

Proposed Drawing

D104  

V2

23 May 2023

Proposed Drawing

D106  

V3

18 August 2023

Proposed Drawing

L102  

V2

14 September 2023

Proposed Drawing

715.001  

D

18 October 2023

Location Plan

001  

V2

4 July 2023

Report/Statement

Activity Noise Assessment  

23-10729 Rev B

17 October 2023

Report/Statement

Planning and Heritage Statement  

21 April 2023

Report/Statement

Transport Statement  

21 March 2023

Report/Statement

Heritage Statement  

21 July 2023

Report/Statement

Phase One Environmental Assessment Report  

EN23138 Cl 001b

18 August 2023

Detail

XXXXXX-HCA-23-XX-DR-E-0101  

P01

14 September 2023

Report/Statement

XXXXXX-HCA-23-XX-RP-E-0001  

P02

18 September 2023

Proposed Drawing

E103  

V3

6 October 2023

Proposed Drawing

0731-TR-0003  

P3

25 September 2023

Report/Statement

Extended Phase 1 Habitat (Ecology)

 

Version 1

7 September 2023

Item H

 

P186

44 The Cliff Brighton BN2 5RE

BH2023/01573

Standard of Accommodation section updated for greater clarity:

Significant concerns were originally held regarding the size and layout of the double bedroom in the LGF flat. Whilst it was recognised that it is an existing bedroom, the proposed subdivision would result in this room becoming the primary bedroom of the LGF flat and its minimal size (11.5sqm as originally proposed) and awkward proportions would have limited its functionality and versatility.

 

The amended plans would increase the size of this bedroom to 12.3sqm and improve the width of the narrowest part by the entrance door. Whilst this bedroom remains imperfect, it is recognised that on the basis of the amended plans it would comply with the NDSS and would also represent a modest improvement on the existing arrangement in terms of the useability of the space. On this basis it is considered that this bedroom can be accepted.

 

The size and layout of the double bedroom in the LGF flat is not ideal. Whilst it is recognised that it is an existing bedroom, the proposed subdivision would result in this room becoming the primary bedroom of the LGF flat and its minimal size (11.5sqm as proposed) and somewhat awkward proportions would limit its functionality and versatility.

 

The applicant was asked to provide updated plans to improve the proportions of the room by reducing the size of the en-suite bathroom. However, the applicant was in the end not agreeable to making this change.

 

Notwithstanding this, the bedroom as existing does comply with the NDSS (albeit at the lowest end of the scale) and is understood to function as an existing bedroom. It is therefore the view of officers that this would not result in significant enough harm measured against the local policy context to warrant refusal of the application.